Project Examples

dudley elem 2.jpg

New Jersey School Construction Authority

State of New Jersey’s $8.6B School Bond Program

$8.6B school bond program for new schools, renovations and life safety upgrades

Role: Program Management services as a consultant to the Program Management team

Lancaster Independent School District

2015 School Bond Program

$125M school bond program that consists of 2 new schools and renovation projects

Role: Pre-Program Services

Logo_InnerGlow_6.png

Ysleta Independent School District

2015 SCHOOL BOND PROGRAM

$430.5 M school bond program that consists of new school construction, additions and renovations, athletic facilities and fine arts facilities.

Role: Program Controls and Project Management  (as a subconsultant)


TXDOT KENDALL COUNTY 1.jpg

Texas Department of Transportation

KENDALL COUNTY IH 10 FROM SH 46 TO CASCADE CAVERNS SCENIC LOOP

$65M Reconstruction grade separations at SH 46 and US 87 South “Y” with reconfigured ramps and frontage road to a one-way operation

Role: Construction Engineering and Inspection

Logo_InnerGlow_5.png

Alamo Regional Mobility Authority

BLANCO ROAD PHASE II

$20M Expansion from existing two-lane rural roadway to four-lane roadway

Role: Construction Inspection

COSA IMP 2.jpg

City of San Antonio

ROADWAY IMPROVEMENT PROJECTS

$100M for various roadway improvements

Role: Construction Management


Logo_InnerGlow_3.png

City of San Antonio

2017-2022 GENERAL OBLIGATION BOND PROGRAM

$850M for various horizontal and vertical projects

Role: Cost Estimating and Construction Phase Services (Inspection)

Logo_InnerGlow_4.png

Austin Bergstorm International Airport

2020 ABIA Architectural and Engineering Services Rotation List

Various airside and landside projects

Role: Cost Estimating and Construction Phase Services

Logo_InnerGlow_2.png

Shreveport Regional Airport

Airfield Development and Rehab IDIQ

Various airfield projects

Role: Constructability Review and Resident Inspection Services


Logo_InnerGlow_1.png

San Antonio Water System

W-6 Upper Segment: Highway 90 to SW Military Drive Sewer Main Project

$190M replacement of approximately 19,000 LF of existing 54-inch sanitary sewer main with 29,000 LF of 60-inch and 96-inch gravity sanitary sewer pipelines via primarily tunnel construction methods

Role: Construction Management and Document Control

ICMS would love the opportunity to speak with you about our additional project experience with clients across the State of Texas! Please be sure to contact us for more information at:

admin@integratedcmsolutions.com