Project Experience

dudley elem 2.jpg

New Jersey School Construction Authority

State of New Jersey’s $8.6B School Bond Program

$8.6B school bond program for new schools, renovations and life safety upgrades

Role: Program Management services as a consultant to the Program Management team

Lancaster Independent School District

2015 School Bond Program

$125M school bond program that consists of 2 new schools and renovation projects

Role: Pre-Program Services

Logo_InnerGlow_6.png

Ysleta Independent School District

2015 SCHOOL BOND PROGRAM

$430.5 M school bond program that consists of new school construction, additions and renovations, athletic facilities and fine arts facilities.

Role: Program Controls and Project Management  (as a subconsultant)


TXDOT KENDALL COUNTY 1.jpg

Texas Department of Transportation

KENDALL COUNTY IH 10 FROM SH 46 TO CASCADE CAVERNS SCENIC LOOP

$65M Reconstruction grade separations at SH 46 and US 87 South “Y” with reconfigured ramps and frontage road to a one-way operation

Role: Construction Engineering and Inspection

Logo_InnerGlow_5.png

Alamo Regional Mobility Authority

BLANCO ROAD PHASE II

$20M Expansion from existing two-lane rural roadway to four-lane roadway

Role: Construction Inspection

COSA IMP 2.jpg

City of San Antonio

ROADWAY IMPROVEMENT PROJECTS

$100M for various roadway improvements

Role: Construction Management


Logo_InnerGlow_3.png

City of San Antonio

2017-2022 GENERAL OBLIGATION BOND PROGRAM

$850M for various horizontal and vertical projects

Role: Cost Estimating and Construction Phase Services (Inspection)

Logo_InnerGlow_4.png

Austin Bergstorm International Airport

2020 ABIA Architectural and Engineering Services Rotation List

Various airside and landside projects

Role: Cost Estimating and Construction Phase Services

Logo_InnerGlow_2.png

Shreveport Regional Airport

Airfield Development and Rehab IDIQ

Various airfield projects

Role: Constructability Review and Resident Inspection Services


Logo_InnerGlow_1.png

San Antonio Water System

W-6 Upper Segment: Highway 90 to SW Military Drive Sewer Main Project

$190M replacement of approximately 19,000 LF of existing 54-inch sanitary sewer main with 29,000 LF of 60-inch and 96-inch gravity sanitary sewer pipelines via primarily tunnel construction methods

Role: Construction Management and Document Control